The Water Supply Improvement Project (WSIP) of the Ghana-Spain Debt Swap Development Programme (DSDP) is funded by the Spanish Government at a cost of US$3.78 million. The project is expected to deliver a total of eighteen (18) water systems (12 small town pipe systems and 6 limited mechanized systems) to serve 69,000 people in thirty-five (35) communities in the Ho Municipality, Ho West, Adaklu and Agotime/Ziope districts in the Volta Region.
Achievements
The projects are UNICEF funded and involve the rehabilitation of Hamile-Happa Water System in the Upper West Region, construction of cost-effective institutional latrines project in the Oti Region, and mechanization of two (2) high yielding boreholes in the North East Region.
Achievements
The Rural Water Utilitization Project (RWUP), financed through a grant of US$ 5.4 Million from Conrad Hilton Foundation involves the construction of pipe water systems at Mpohor and Wassa Dunkwa in the Western Region. It is expected to serve a total population of 15,000 people.
Achievements
The project covers Kasena Nakana, Nabdam, Binduri and Pusiga Districts of the Upper East Region and involves;
Achievements
A GoG funded at a cost of GHS 13.4 Million. It involves the reconstruction of the broken down water system at Ejura in Ashanti Region. The project which started in July 2022, is expected to end in December 2023 and involves:
Achievements
A 2-year project funded by GoG at a cost of GHS 26,465,880.94. It involve the reconstruction of the existing pipe water system
Achievement
A 2-year project funded by GoG at a cost of GHS 6,406,200.55. It involves the reconstruction of the Sefwi Wiawso pipe water system
Achievements
A 2-year project funded by GoG at a cost of GHS 24,755,113.33. It involves:
Achievements
A 1.5-year project funded by GoG at a cost of GHS 18,078,103.03. It involves:
A 1-year project funded by GoG at a cost of GHS 2,029,557.90. It involves:
Achievement
A 1-year project funded by GoG at a cost of GHS 13,833,449.03. The project involves:
Achievements
The project was financed through an IDA/World Bank US$ 45.7 Million loan facility (2017-2020). It covered eleven (11) regions; Central, Western, Western North, Bono East, Bono, Ahafo, Upper West, Upper East, Northern, North East and Savana regions.
Achievements
The Five Districts Water Supply Project was expected to supply safe water to a total population of 234,411 in two hundred and sixty (260) communities in five (5) districts, namely Central Tongu, North Tongu, Ho West, Adaklu and Agortime Ziope in the Volta Region. The concept was to phase out the project activities into four (4). Phases 1 and 2 were completed with a loan facility of €16.8 million from the Raiffeisenbank International Bank AG of Vienna, Austria.
Achievements under phases 1 and 2 include:
An additional loan facility of €11.5million was secured for the implementation of phase 3 to supply safe water to about 89,107 people in 183 communities in 4 districts, i.e. Central Tongu, North Tongu, Adaklu and Agotime Ziope. The project comprised;
Achievements
The project was funded by Conrad Hilton Foundation at a cost of US$200,000 and comprised:
Achievements
The project was financed by NPA at an wamount of GHS500,000.00 and aimed to improve water supply in small communities in Eastern, Savannah and Northern regions. It involved:
Achievements
This is a GoG funded project a cost of GHS 10,517,853.00 and spanned from September, 2020 to September 2022. It involved reconstruction of the Mim broken down water system.
Achievements
A GoG project implemented at a cost of GHS 9.6 Million and spanned from September 2021 to December 2022. It involved reconstruction of the broken down water system at Yeji.
Achievements
A 1-year project funded by GoG at a cost of GHS 1,593,494.91. It involved the reconstruction of the Wulensi pipe water system.
Achievements
A GoG funded project at a total of GHS 34 Million. It was expected to improve water services delivery in 168 beneficiary communities and new industries.
Achievements